Intelligent Transformation of Railway Transport Branch of Shandong Provincial People's Procuratorate
Project Overview
Project typeIntelligent energy management system
AddressJinan City, Shandong Province
Capacity1,600kVA
TimeJuly 2023
Main productsSmart gateway serial server multifunctional meter AI camera
Project introduction
The new multi-function meter in the substation realizes the collection of data from the bottom equipment, uploads data to intelligent gateways through serial servers, thus realizing the real-time uploading of the electric parameters of the electric equipment used in the substation. With AI cameras to monitor the operating environment of the substation around the clock, low-cost transformation of the old substation is possible to realize the digital operation.